34. The minimum duration of the activity is 30 hours. The subject matter covered includes(1) assessment of the incident scene;
(2) positioning of pumping apparatus at the scene of operations;
(3) static or dynamic water source;
(4) nozzle pressure supply and control during intervention;
(5) stopping of pumping; and
(6) return to service of pump.